Fee Schedule

NameFee
Approval Not Required$250 for zero or one additional lot plus $50 per lot for each additional lot.
Subdivision PlansN/A
Preliminary Plan$750 plus $125 per lot.
Definitive Plan$1500 plus $250 per lot after a preliminary plan approval, or $2500 plus $750 per lot if there was no preliminary plan. Applicant pays out-of-pocket costs, including engineering review.
Modification$500, plus out-of-pocket costs, including engineering review.
Site Plan$750 plus out-of-pocket costs, including engineering review. No fee for a preliminary site plan review. $250 for modification, plus out-of-pocket costs.
Special Permit$950 plus associated and related costs, including engineering review. $475 for renewal.
Scenic Road Act Permit$25 plus the cost of advertising the hearing.


Pay with Unipay.

This fee schedule was adopted by the Planning Board at a hearing held on February 25, 2004.